What a difference a week makes.  This time last week we were busy trying to get water off the courses so play could proceed in the Championships and this week we are pumping water onto the courses due to the dryness.  Probably a nice problem to have given the rain we have been getting though.  The storms that blew through last night and early this morning were certainly spectacular light and noise shows but not much rain fell which again was a nice break.  We did get a little bit of hail in the storm around 6am this morning but not enough to do any damage.

A really busy play week with 8am 2 tee starts on the River course all week and they were very slow, particularly in the wind today.  It didn't afford us much time to get much work done on the River course except in the mornings before they teed off.  A course closure this afternoon on the River course finally gave us the chance to get out there for a few hours unhindered.

Speaking of the River course and it's THAT time again, yes greens renovation.  The greens are certainly healthier than last year when they were just about worn out from the amount of play we get.  The shaded greens are still a bit weaker and as usual won't get the same treatment as those with more light penetration.  That pretty much goes year round with all our programs differing slightly to cater for the shaded greens.  This years renovation will, as always, be dependent on the weather we get next week.  As I have said many times we get a better result with most processes in the dry, so here's hoping.  We will be endeavouring to get the greens scarified to -5mm, de-thatched to -3mm and hollow tine aerated with 9mm tines.  The greens will then get some fertiliser and then top dressed with a blended sand.

First load of blended sand arriving.

 

Friday, October 18, 2024

A pretty frustrating week just gone by with the weather playing havoc with all of our operations.  The rain just wouldn't leave us alone to dry out and Wednesday nights 27mm was not what we needed.  And quite annoyingly there were only three locations in the Northern Rivers that received more than a few mm on Wednesday night and that was the three green dots in the circle below.  Chinderah, which is just across the River, Banora Point, which is at the sewerage treatment plant where we get our irrigation water from near Bunnings, and US.  Just over 200mm in seven days.  Frustrating.

Frustrating to say the least.

 

Another 27mm rainfall event happened last Saturday night into Sunday and had carts off both courses on Sunday.  We were still really wet Monday morning but had the Gold Coast District Super Senior Classic on the West as a shotgun.  Carts shouldn't have really been out there but I thought they might respect being allowed....but how wrong I was.  These shots below are from two groups in a row on 16W with the signs pretty plain to see right next to the tee markers.  Frustrating.


No comment needed.

To allow us a chance to get some work done and prepare for the Club Champs, the Board approved the closure of the course from 1pm the Friday before, which is what happened today.  The amount of work we can get done unhindered is amazing to say the least and one of our goals is to get most of the front nine bunkers raked to save time on Saturday morning.  Only three groups in the Friday members comp would have played the RHS bunker on 4W after it was raked this afternoon, and this is what we got.  Frustrating. 

Picked the rake up but didn't know how to use it?

Another fairly major step in the irrigation installation was the assembly of the pump set and control panel this week.  It's no easy task moving such heavy precision instruments around and the contractors did a great job.  Now for some power supply and pipework and we will be pumping.  Not frustrating.

Ducks in a row.

The control panel.


Friday, October 11, 2024

Another pretty accurate forecast from the weather bureau this week although they did miss with the volume of rain.  142mm all up for the week with 135 of that falling in about nine hours on Wednesday night.  Safe to say it didn't help with our Club Champs preps.  But full credit once again to the crew with the way they turned the courses around on Friday with Thursday virtually being a write off.  The short week after the public holiday didn't help much either.  A day like Thursday with no play does give us a chance to do a couple of jobs that are difficult to do in play and that was to hang two new practice nets and edge the paths on the West course with the paths being about the only dry thing out there!!  Some machine prep for the upcoming River course greens renovation was also done which is a very time consuming job.

A couple of shots below to demonstrate the volume of water that was out on the courses.  The photo across 18W and R was at 6pm Wednesday after only 60mm so there was another 70 dumped on top after that.  The other photo is of 12W fairway.  The main drain that drains this fairway was completely covered with debris not allowing the water to move but again just shows the volume of water that was there.


Looking across 18W & R from the entry road.

12W fairway early Thursday morning.


Friday, October 4, 2024

I had a very enjoyable break with some really good weather throughout but arrived back to the mess that was left after the cyclonic conditions that an east coast low weather system can, and did produce.  To get the course back to where it is today after what confronted us on Monday morning (photos below) is a credit to the crew despite some more very windy days making the clean up extremely difficult and frustrating.  Dads Army did an almighty job stick picking the rough areas on Tuesday and removed a huge amount of debris to allow us to continue mowing.  The bunkers literally become leaf collectors and a huge amount of time and effort is devoted to them to restore playability.

16R fairway bunker full of leaves.

18R fairway with turf barely visible.

Elsewhere on the courses things have ticked along really well and the irrigation install continues with 19 holes now completed.  The new pump set has been delivered and we are currently waiting on some approvals from our electricity supplier for the install to be completed.  Meanwhile next week we will be moving to 15W for the next hole install.  An upcoming forecast of dry warm weather will allow us to really put the new system to the test, however until the new pump set is installed and all the larger diameter pipe is online it is difficult to really see the benefits.  One of the main challenges we have had so far is to keep both the new and old systems operating side by side but so far we have done very well.

Unfortunately while I was away one of the crew decided to return home to Ireland after working with us for the past ten months.  Simon was a proficient greenkeeper who will hopefully one day return to our shores for another stint with us.  A couple of months ago I was contacted by a Spanish greenkeeper who is currently third in charge at Golf Club Crans-sur-Sierre in Crans-Montana Switzerland, where they host the Omega European Masters each year.  He is keen to come to Australia to work for three months while their course is closed for the ski season.  I was able to meet with him during my travels and have confirmed employment for him for three months from December.  Short term accommodation is scarce so if any followers have some temporary lodgings available it would be most appreciated and you could leave some details with the front office.  

October is Club Championship time for the men so hopefully the weather behaves and we can produce some good playing conditions for the competitors.  October is a notoriously windy month so here's hoping we get some good days coming up.

 

Pretty accurate sign??