One last post before I go on leave to update readers on some upcoming works.
Following Board approval a contractor has been engaged to install concrete cart paths on 1 and 9R. Both paths are to be routed down the LHS as you play the hole.
The rockwall revetment on the dam at RHS 6R green will be re-built by other contractors. Both these projects are scheduled to start on Monday October 12. There will be some disruption to play as holes will need to be closed / modified to ensure safety of the contractors and our staff. The weather needs to play a helping hand in both these significant projects.
We also have a "topmaker" machine booked for early November. This machine literally shaves off the top of the fairway thereby removing the thatch layer. We are hoping to get both the second half of 4 and 10W fairways done where they are wet so as to hopefully give them a chance to dry out in rain events in the future.
The River greens renovation in late October will be split over two weeks to allow us to do a major renovation. The first Monday / Tuesday (Oct 26 & 27) will see the greens scarified and then mown back down to normal height so they should play alright. The second Monday / Tuesday (Nov 2 & 3) will see the coring and sanding of the greens where there is some of the surface disruption traditionally associated with green renovation. The greens are very weak after such a dull winter due to the constant cloud cover associated with the rain. We have also not been able to renovate them properly 4 of the last 5 years due to poor weather so they are desperate for a good renovation.